![]() ![]() “The reconstruction of Garfield Avenue will include a number of amenities to increase the safety of those seeking alternative transportation methods. In 2021, the Lincoln Street and Washington Street intersections were upgraded along with additional pedestrian improvements such as a pedestrian refuge island near the Civic Center crossing as part of the Sidewalk Gap & Infill Project and the Safe Routes to School Project. The project will result in a conversion from a 4 to 3 lane avenue with bike lanes south of Eighth Street.ĭriveway flares are to be removed in two locations and sidewalk ramps will brought into compliance with ADA requirements along the corridor at the Boyd, Eighth Street, Walnut Street, Titus Street, Webster Street and State Street intersections. The resurfacing of Garfield Avenue from Hannah Avenue to Front Street kicked off on Apand was completed on May 6, 2022.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |